A peeling epoxy floor on a commercial site rarely fixes itself, and the usual first instinct, to paint over it, is the one decision that can waste the most money. Before choosing between a recoat and a full strip, the floor needs to be diagnosed. Where is it lifting? How well is the rest of it bonded? What was underneath when the original coating went down? This guide is for operations managers and property managers who have inherited a floor that is flaking, bubbling or lifting in sheets.
Why coatings let go
A December 2025 article on inadequate surface preparation in industrial epoxy flooring lists the usual suspects. Sweeping or pressure washing without mechanical preparation leaves a weak surface layer and a slab that is too smooth for a high-build coating. Contaminants such as oils, greases, tyre residues, plasticiser marks, old sealers, curing compounds and hydrophobic treatments leave poorly bonded areas. Coatings put on young or wet slabs, or over slabs without an effective vapour barrier, can blister, whiten and debond. Mistakes in the coating system itself also appear, including wrong resin to hardener ratios, use after pot life has expired, incompatible primers and body coats, and application outside the recommended temperature range (Becosan).
Most of those causes were set in place on installation day, and the pattern of peeling is the clue. Lifting along walls and edges can point to moisture or poor edge preparation. Lifting in wheel paths can point to loads the system was not built for. Scattered patches can suggest contamination in the slab, and lifting along joints can mean a rigid coating was bonded across movement.
What proper preparation looks like on paper
A data sheet from a major Australian coating manufacturer shows the standard to compare against. For a water-borne epoxy floor coating, dated December 2025, the concrete must be at least 28 days old. It is diamond ground, track blasted or mechanically abraded to remove laitance, curing compounds, hardeners, sealers and other contaminants, and to provide a concrete surface profile of CSP 2 to 3 per ICRI 310.2R. Dust is removed by vacuuming, and large cracks and voids are filled with a suitable filler. The sheet asks for moisture checks before coating: an electronic moisture meter reading that does not exceed 6 percent, and a plastic sheet test showing no visible moisture. For projects over 500 m² or where moisture is a concern, it asks for at least one further test method, such as calcium chloride or relative humidity testing (Dulux Protective Coatings).
The same sheet adds a caution that is easy to overlook. It says that testing cannot guarantee avoidance of future moisture problems, particularly with existing slabs, and that this is especially true where an under-slab vapour barrier cannot be confirmed or where the slab is contaminated by oils, chemical spills or unreacted silicates. In other words, a floor that has already failed once may have an underlying cause that preparation alone has not solved. If you want a deeper look at moisture, our commercial warehouse flooring page explains the system we build from the slab up.